Selected menu has been deleted. Please select the another existing nav menu.
=

Chandigarh Mayor launches ₹1.04-crore development works in Burail

Lorem ipsum dolor sit amet consectetur. Facilisis eu sit commodo sit. Phasellus elit sit sit dolor risus faucibus vel aliquam. Fames mattis.

HTML tutorial

Chandigarh Mayor Saurabh Joshi on Monday laid the foundation stone for the construction of a sanitation booth in Burail, Ward No. 33, highlighting the Municipal Corporation Chandigarh’s ongoing efforts to upgrade essential civic facilities in the area. Area councillor Kanwarjeet Singh and other prominent residents were also present on the occasion.The construction of the sanitation booth is being undertaken at an estimated cost of Rs 27.29 lakh.The Municipal Corporation is also strengthening the storm water drainage system at Saini Mohalla, Village Burail, at an estimated cost of Rs 76.77 lakh. The project involves the provision and laying of a Storm Water Drainage (SWD) pipeline, which will be connected to the Capital Storm Water Drainage System to ensure smooth and efficient disposal of rainwater.The drainage project aims to improve rainwater management, reduce the risk of waterlogging during heavy rainfall and provide a more efficient drainage network for residents of the locality, particularly during the monsoon season.The two civic projects entail a combined estimated expenditure of Rs 1.04 crore.

HTML tutorial

Tags :

Search

Popular Posts


Useful Links

Selected menu has been deleted. Please select the another existing nav menu.

Recent Posts

©2025 – All Right Reserved. Designed and Developed by JATTVIBE.