Selected menu has been deleted. Please select the another existing nav menu.
=

Punjab’s Lehra Mohabbat thermal plant unit restored, generates 169 MW

Lorem ipsum dolor sit amet consectetur. Facilisis eu sit commodo sit. Phasellus elit sit sit dolor risus faucibus vel aliquam. Fames mattis.

HTML tutorial

The fourth unit of Guru Hargobind Thermal Plant (GHTP) at Lehra Mohabbat in Bathinda district has been restored and is currently generating 169 MW of power.The 210-MW unit had developed a snag on Friday, forcing it to shut down and leaving the entire 920-MW plant non-operational. The unit had been the only operational unit at the plant before it developed the technical fault.The restoration of the fourth unit brings partial generation back to the plant, although the other three units continue to remain non-operational.Sources said that efforts were afoot to restore the remaining three units as well, which are facing operational difficulties following a strike by outsourced workers, who are demanding direct engagement with the Punjab State Power Corporation Limited (PSPCL).

HTML tutorial

Tags :

Search

Popular Posts


Useful Links

Selected menu has been deleted. Please select the another existing nav menu.

Recent Posts

©2025 – All Right Reserved. Designed and Developed by JATTVIBE.